LTS offers an installation and commissioning service to customers who want “turnkey” commissioning of a old/not-working Mass Spectrometer (LC/MS/MS), High Performance Liquid Chromatography (HPLC) and Gas Chromatography (GC). LTS technical personal will spend up to three days on site, performing installation, configuration and testing.

  • The customer is responsible for ensuring that the following stages of installation have been completed prior the the arrival of LTS personnel:
  • AC power wiring for the instrument is installed and connected at the breaker panel or the building’s service entrance. Otherwise, the customer must ensure that an approved electrician is present for this task.
  • Identify the equipment by providing description, location of the item, Manufacture, Model #, Serial #
  • If the equipment was used with hazardous materials, create the list and indicate which type of materials used.
  • For usage with radioactive materials, list the radioisotope(s) used and clean with the appropriate cleaning solution. Document the cleanup date and the cleaning solution used.

 This form should be used to clear equipment that has the potential for contamination